1.
General
Furnish and install
as shown on the plans ____ one (1) Precision model FPS____-_____
forced draft, gas fired vertical firetube boiler rated at _____ boiler
horsepower. Boiler shall be designed for a maximum allowable working
pressure of (15psi) (150psi) and shall deliver _____lb/hr (F&A 212º
F) of steam at ____ psi (up to 135 psi) operating pressure. Boiler
shall be completely factory assembled and tested, with controls and
trim as specified below. Complete package shall be UL Listed and
shall carry the Underwriters Laboratories Listing Mark. Units rated
at 9.5 boiler horsepower and over shall also comply with ASME CSD-1.
Boiler shall be designated for _____V, _______PH, _______HZ electrical
supply with single power connection.
2. Pressure Vessel
Vessel shall be
constructed and stamped in accordance with ASME Section IV (15 psi) or
Section I (150 psi) and shall be registered with the National Board.
Shell and tubesheets shall be fabricated from carbon steel. Tubes
shall be 2” OD x 0.105 wall SA178A ERW tubing. Vessel shall be stress
relieved (units > 15psi design) and equipped with inspection openings
as required by ASME Code.
3. Combustion Chamber
Combustion chamber
shall be fabricated from steel plate, lined with ceramic fiber
blanket. Combustion chamber wall and bottom shall be of monolithic
construction, formed from high temperature refractory, not less than
4” thick.
4. Burner
Provide
forced-draft, flame retention head burner to burn natural (LP) gas
with on-off (low-high-low or full modulation) firing rate control.
Burner shall be equipped to fire at a maximum input of _____Btu/hr at
an elevation of _____ ft. Blower motor shall be 3450 rpm design with
motor starter (units over ¾ hp). Burner controls shall conform to
UL795 (and CSD-1, FM, IRI codes). For electrical supplies other than
120V, the burner shall be equipped with a control circuit transformer.
5. Boiler Controls
Boiler shall be
provided with the following controls:
-
Properly sized
ASME safety valve(s) set at _____psig, manual drain valve and
pressure gauge with gauge cock.
-
Operating control
and manual reset high limit control with siphon manifold; high-low
modulating control (where appropriate)
-
Automatic reset,
float type primary water level control with water level gauge glass
and manual blowdown valve; probe type auxiliary water level control
with manual reset with pilot light.
-
Slow opening and
quick opening bottom blowdown valves (units > 100 psi).
6.
Packaging
Complete package
shall be factory assembled and mounted on structural channel support
skid. All specified components are to be mounted, piped and wired.
Boiler shall be insulated with a minimum of 4 inches of ¾ pound
density fiberglass and housed in a rectangular, 16 gauge enamel
painted steel jacket. Jacket temperatures shall not exceed 130º
F during continued operation at high fire. Lifting lugs shall be
provided to allow rigging of package during installation.
7.
Quality Control
Complete packaged
boiler shall be manufactured by Precision Boilers in strict accordance
with ASME Boiler and Pressure Vessel Code in an ISO 9002 quality
system.