Products:
Fired: UF Series
UF Series Packaged Watertube Boilers
Specification
Note: items shown in parenthesis () are options.
1. General
Furnish and
install as shown on the plans ____ one (1) Precision model
MC___-____-____ forced draft, (natural gas) (propane) (oil) (gas/oil)
fired watertube (steam) (water) boiler rated at _____ boiler
horsepower. Boiler shall be designed for a maximum allowable working
pressure of ____psi and shall operate at _____psi. Boiler shall be
completely factory assembled and tested, with controls and trim as
specified below. Complete package shall be UL Listed and shall carry
the Underwriters Laboratories Listing Mark. Units rated at 9.5 boiler
horsepower and over shall also comply with ASME CSD-1. Boiler shall
be designated for _____V, _______PH, _______HZ electrical supply with
single power connection.
2. Pressure Vessel
Vessel shall be
constructed and stamped in accordance with ASME Section IV (hot water
or 15 psi steam) or Section I (150 psi) and shall be registered with
the National Board. Drums and tubes shall be fabricated from carbon
steel. Tubes shall be 1-1/2” OD x 0.105 wall for units up to 500 BHP,
2” OD x 9.105” wall for units > 500 BHP, SA178A ERW tubing. Vessel
shall be stress relieved (units > 15psi design or > 160 psi or 250º F
hot water)and equipped with inspection openings as required by the
applicable ASME Code.
3. Combustion Chamber
Combustion
chamber shall be tangent water wall on all sides. Combustion chamber
rear wall shall be of high temperature refractory, not less than 4”
thick.
4. Burner
Provide
forced-draft to burn (natural gas) (oil) (gas/oil) (propane) with
(on-off) (low-high-low) (full modulation) firing rate control. Burner
shall be equipped to fire at a maximum input of _____Btu/hr at an
elevation of _____ ft. Blower motor shall be 3450 rpm design with
motor starter (units over ¾ hp). Burner controls shall conform to
UL795, CSD-1 (FM) (IRI) requirements. For electrical supplies other
than 120V, the burner shall be equipped with a control circuit
transformer.
5. Boiler Controls
Boiler shall be
provided with applicable trim and controls as required by ASME:
As a minimum, the
following shall be provided:
-
Hot Water:
temperature gauge, pressure gauge (with cock), manual vent valve,
properly sized safety relief valve(s), drain valve, low water cutoff
of (probe) (float) type, temperature limit cutout, operating
temperature control.
-
Steam:
pressure gauge (with cock), water sight gauge, properly sized safety
valve(s), blowdown valves, surface blowoff provision, low water
cutoff of (probe) (float) type, level control, pressure limit
cutout, operating pressure control.
6. Packaging
The boiler shall
be completely factory assembled and mounted on structural channel
support frame. Lifting lugs are to be an integral part of the support
frame to facilitate lifting and rigging. All specified components
will be factory mounted, piped and wired. Boiler shall be insulated
with durable ceramic fiber, mineral wool, and fiberglas insulating
materials such that the outside surface temperature will not exceed
130º F during continuous operation at maximum firing rate.
The boiler is to be housed in a rectangular outer casing of steel and
coated with a durable enamel finish.
7. Quality Control
Complete packaged
boiler shall be manufactured by Precision Boilers in strict accordance
with ASME Boiler and Pressure Vessel Code in an ISO quality system.
|
   
|
|